Pine Development

  • Description text goes here
  • Description text goes here
  • Description text goes here

Pine work is different for trees in different states of development. The tree on the left is 4-5 years old from seed. Middle tree 7-9 years old but not well-developed. Shohin medium or large mature trees like that on the right are usually at least 20-25 years old.

Sacrifice branches are the only way to significantly increase the size and/or taper of the trunk. Consider using a well-placed branch on older and under-developed material to increase girth and taper.

November: Wire young branches. Leave small buds on the trunk unwired unless they are the size of a chopstick and 4-5 inches in length. Reduce old needles only to maintain finished branches if they are dense. If branching is sparse leave old needles. If any branches were decandled perform the normal bud selection as with a mature tree on those branches.

Reduction of the sacrifice branch can be done at this time – anytime a sacrifice branch is reduced it will greatly increase the vigor of the lower branching. Cut up to 75% of the sacrifice branch off at one time but not all of it. Consider leaving the first side branch on the sacrifice as a new sacrifice.

March-May: Fertilize heavily. For trees in development more fertilizer will lead to faster growth and development. Remove female cones by gently twisting them off of the tips of the strong branches.


Caution: Do not over water. Water as needed, even high drainage soil and pond basket or colander.

treeMichael Weipine, training, styling